Skip to main content

PDF


Title: Maidenhead, Windsor and Eton flood alleviation scheme - water quality proof : public enquiry September 1992
Author: I.M. Adams
Document Type: Monograph
Abstract:
This report describes the duties and responsibilities of the National Rivers Authority with regard to water quality and will also address the water quality aspects of the proposed flood alleviation scheme. It also considers the water quality of the River Thames and of the ground water in the Maidenhead area, the impact of the construction phase on these, and implications for the water quality of the River Thames and of the new channel once the scheme is completed and comes into operation.
Publisher: National Rivers Authority
Publication Date: 1992
Publication Place: Reading
Subject Keywords: Water qualityFlood controlGroundwaterRivers
Geographic Keywords: ThamesMaidenheadMaidenhead to Sunbury catchment
Extent: 39
Permalink: http://www.environmentdata.org/archive/ealit:3655
Total file downloads: 306

Download PDF    Display PDF in separate tab