1 | Hampshire Avon DTC Diatom Monitoring Dataset 2011-2013 |
2 | Hampshire Avon DTC Macrophyte Monitoring Dataset 2011-2013 |
3 | Hydrology and water quality monitoring at Burracott, Neet catchment |
4 | Hydrology and water quality monitoring, Caudworthy Water at Caudworthy Ford, Tamar catchment |
5 | Laboratory analysis of water samples, Winnacott Bridge at Caudworthy Ford, Tamar catchment |
6 | Hampshire Avon DTC Hydrology and Water Quality Monitoring |
7 | Laboratory analysis of water samples, Caudworthy Water at Caudworthy Ford, Tamar catchment |
8 | Data for DTC Phase I from Hampshire Avon DTC Consortium |
9 | Bank-side monitoring of river hydrology and water quality, Burracott, Neet catchment |
10 | Laboratory analysis of water samples, Burracott, Neet catchment |
11 | Bank-side monitoring of river hydrology and water quality, Caudworthy Water at Caudworthy Ford, Tamar catchment |
12 | Hydrology and water quality monitoring, Winnacott Bridge at Caudworthy Ford, Tamar catchment |
13 | Supplemental inforrmation for field monitoring and laboratory analysis |
14 | Hampshire Avon DTC Macroinvertebrate Monitoring Dataset 2010-2013 |
15 | Hampshire Avon DTC Deposited Fine-grained Sediment Monitoring Dataset 2010-2013 |
16 | Freshwater Tamar catchment management plan : first annual review : April 1996 to March 1997 |
17 | Freshwater Tamar and tributaries catchment management plan : consultation report |
18 | River Tavy catchment river water quality classification 1991 |
19 | River Lynher : catchment action plan |
20 | Roadford operational and environmental study : interim report. Volume 1 : main report |
21 | Organo-chlorine pesticide residues in freshwater fish [eels] |
22 | Biological study of Upper Tamar Lake 1997 : final report |
23 | Monitored water temperature, pH value and dissolved oxygen concentration at Burracott, Neet catchment |
24 | Roadford operational and environmental study : draft final report : Volume 5 : annex G monitoring, annex H reservior operating agreement |
25 | Freshwater Tamar catchment management plan : first annual review : April 1996 to March 1997 |