1 | The Lowermoor environment report |
2 | Help safeguard the Torridge (leaflet) |
3 | An investigation into the bacteriological levels in the River Seaton |
4 | A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024 |
5 | Investigation to determine if the soakaway from the Stowford Farm caravan site is having an impact on the biological community of the Colam stream |
6 | Water resources for the future : a summary of the strategy for Thames Region |
7 | Bacterial quality of the bathing waters at Seaton, Cornwall, and of the River Seaton |
8 | Evaluation of FRONTIERS accumulation forecasts in the NRA Thames and North West regions : final report of the Joint Met |
9 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
10 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
11 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
12 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
13 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
14 | Second annual review of the River Taw catchment management plan |
15 | Second annual review of the Taw / Torridge Estuary catchment management plan |
16 | An investigation of sewage on the beach at Porthcothan |
17 | Impact assessment of acidic and metalliferous pollution in the Fowley Stream |
18 | The Don, Rother and Dearne catchment (river factfiles) |
19 | Second annual review of the River Torridge catchment management plan |
20 | Second annual review of the Lower Bristol Avon catchment management plan |
21 | Identification of water quality problems in the Strat and Neet catchments |
22 | Second annual review of the Upper Bristol Avon catchment management plan |
23 | The Seaton, Looe and Fowey catchment management plan : action plan |
24 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
25 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |