1 | Help safeguard the Torridge (leaflet) |
2 | An investigation into the bacteriological levels in the River Seaton |
3 | Preventing the spread of crayfish plague in the South West |
4 | Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River |
5 | Investigation to determine if the soakaway from the Stowford Farm caravan site is having an impact on the biological community of the Colam stream |
6 | An investigation into the water quality of the River Waldon during wet weather |
7 | Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon |
8 | Bacterial quality of the bathing waters at Seaton, Cornwall, and of the River Seaton |
9 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
10 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
11 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
12 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
13 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
14 | The Hartland Streams catchment management plan : action plan |
15 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
16 | Second annual review of the River Taw catchment management plan |
17 | Second annual review of the Taw / Torridge Estuary catchment management plan |
18 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
19 | Impact assessment of acidic and metalliferous pollution in the Fowley Stream |
20 | Second annual review of the River Torridge catchment management plan |
21 | Review of fishery regulations on the Rivers Taw and Torridge |
22 | First annual review of the River Taw catchment management plan (1996) |
23 | The Seaton, Looe and Fowey catchment management plan : action plan |
24 | Impact of reservoir construction construction on the Bruckland Stream |
25 | Non-compliance with water quality objectives on the Croyde stream (upper catchment) |