Skip to main content
#Title
1Study into the effect of Chertsey STW on the North Arm of the River Bourne
2The effects of Guildford STW on the River Wey
3The control of phosphorus in the catchment of the rivers Ant and Bure : interim report for period January - December 1992
4Biological assessment of the effects of Ivybridge Sewage Treatment Works on the River Erme
5Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon
6A review of the performance of Aldershot STW and its effect on the River Blackwater
7Bacterial quality of the bathing waters at Seaton, Cornwall, and of the River Seaton
8Study of the behaviour and impact of two sewage treatment works of the Thames catchment
9Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
10Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
11Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
12An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95]
13Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989
14Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool
15Investigation into the frequency of storm overflow operation at Bradworthy sewage treatment works (1996)
16Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
17An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream
18Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001)
19Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality