1 | The restoration of the River Pang |
2 | The management of the water resources of the Lark groundwater unit |
3 | The River Darent conservation project |
4 | A Report on the Drought on the River Darent |
5 | The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society |
6 | A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024 |
7 | Naturalisation of the Orton flow record |
8 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
9 | The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994 |
10 | The Adur and Ouse catchment abstraction management strategy : consultation document |
11 | The Yarrow catchment : recommendations for statutory water quality objectives |
12 | The Test catchment southern : recommendations for statutory water quality objectives |
13 | The Worcestershire Stour catchment : recommendations for statutory water quality objectives |
14 | The Dove catchment management plan : consultation report summary : January 1995 |
15 | The Loddon catchment, Thames : recommendations for statutory water quality objectives |
16 | Wimbleball pumped storage scheme : review of environmental statement (appendix B3) : implications for water quality in Wimbleball Reservoir, the River Exe (non QUASAR) parameters) and the Exe estuary |
17 | Alleviation of low flow studies : the River Avon and its tributaries near Malmesbury : towards a solution |
18 | Low flows and water resources : facts on the top 40 low flow rivers in England and Wales |
19 | East Devon public water supply strategy : the existence and potential use in yield analysis of historic flow records |
20 | Low flows and water resources : facts on the top 40 low flow rivers in England and Wales |
21 | Development of Environmental Standards (Water Resources) Stage 1: Identification of Hydro-morphological parameters to which the aquatuc ecosystems is sensitive |
22 | Darent action plan : restoration of low flows to the river Darent : public statement to accompany application to vary groundwater abstraction licences at Sundridge, Lullingstone, Eynsford, Horton Kirby, Darenth and Bexley |
23 | Local environment focus : local environmental issues in and around Leicester, Loughborough, Melton Mowbray, Shepshed, Narborough, Syston and Kegworth : Local Environment Agency Plan (LEAP) for the Soar : 3rd annual review : August 2001 |
24 | Local environment focus : local environmental issues in Shrewsbury, Shawbury, Newport, Telford, Shifnal, Much Wenlock, Bridgmorth, Bewdley, Bromsgrove, Droitwich and Worcester : Environment Agency newsletter for the Middle Severn, May 2003. |