Skip to main content
#Title
1Study into the effect of Chertsey STW on the North Arm of the River Bourne
2Water Quality of the Humber Estuary 1986
3Report for Anglian Water, NRA Unit on the uses of the Orwell and the Stour Estuaries and the use of the mathematical model to derive long term consent limits for all inputs to Orwell Estuary
4Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
5An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
6An assessment of the causes of non-compliance with river quality standards within the River Tiddy catchment (1989-1991)
7Continuous water quality monitoring results for the Upper Tamar
8River quality in England and Wales : a report of the 1990 survey
9Environmental assessment of selected abandoned minewaters in the North East region
10Report for Anglian Water, plc on the use of the Orwell Estuary mathematical model to derive long term consent limits for Cliff Quay STW
11A study of the use of Glycol-based de-icers at RAF Lyneham and their impact on local watercourses during the winter of 1999/2000
12The evaluation of a Partech model 5100 hand-held dissolved oxygen meter (220/26/T)
13The evaluation of a pHOX model 962 hand-held dissolved oxygen meter (220/28/T)
14An investigation of the Madford River pollution incident of 29 July 1989 : November 1989
15Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool
16Monitoring of the River Burn upstream and downstream of Burnham Market sewage treatment works 1999
17The evaluation of an ABB Kent-Taylor model 7135 hand-held dissolved oxygen meter (220/30/T)
18The evaluation of a LTH BOM 1 hand-held dissolved oxygen meter (220/25/T)
19The evaluation of a WTW model OXI 196 hand-held dissolved oxygen meter (220/29/T)
20The evaluation of a YSI model 58 hand-held dissolved oxygen meter (220/24/T)
21Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996
22The FBA-Welsh Water simulation model of phytoplankton dynamics in flushed systems. Authentication in a coastal lagoon