Skip to main content
#Title
1The restoration of the River Pang
2The River Darent conservation project
3Investigation into the cause of high pH in the Budleigh Brook
4The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society
5A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
6Hydropower developments and the National Rivers Authority
7Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies
8Changes to the water abstraction licensing system
9Naturalisation of the Orton flow record
10Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS
11Exploration of the reasonable needs for new licences brought about by the Water Act 2003
12Swords water quality study - phase 1 : modelling the water quality of the River Thames
13Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR)
14Review of the water abstraction charges scheme : consultation document : summary of responses to the consultation
15Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin
16The Possible effects on migratory fish in the River Dee of increased water abstraction
17Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000
18Water for the future in Kent : NRA response to the issues and options report
19East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
20River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
21Catchment abstraction management strategies (CAMS) and the Water Framework Directive (WFD)
22The Adur and Ouse catchment abstraction management strategy : consultation document
23The Yarrow catchment : recommendations for statutory water quality objectives
24The Wandle, Beverley Brook, Hogsmill catchment management plan : action plan : July 1995
25Fisheries of the middle and lower Wylye and factors affecting their performance