Skip to main content
#Title
1The restoration of the River Pang
2Investigation into the cause of high pH in the Budleigh Brook
3The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society
4A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
5Hydropower developments and the National Rivers Authority
6Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies
7Changes to the water abstraction licensing system
8Naturalisation of the Orton flow record
9Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS
10Exploration of the reasonable needs for new licences brought about by the Water Act 2003
11Swords water quality study - phase 1 : modelling the water quality of the River Thames
12Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR)
13Review of the water abstraction charges scheme : consultation document : summary of responses to the consultation
14The Possible effects on migratory fish in the River Dee of increased water abstraction
15Water for the future in Kent : NRA response to the issues and options report
16East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
17River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
18Catchment abstraction management strategies (CAMS) and the Water Framework Directive (WFD)
19The Adur and Ouse catchment abstraction management strategy : consultation document
20The Yarrow catchment : recommendations for statutory water quality objectives
21The Wandle, Beverley Brook, Hogsmill catchment management plan : action plan : July 1995
22Fisheries of the middle and lower Wylye and factors affecting their performance
23The Test catchment southern : recommendations for statutory water quality objectives
24The Louth coastal catchment management plan : final report
25The Wandle, Beverley Brook, Hogsmill catchment management plan : consultation report : November 1994