Skip to main content
#Title
1Bacteriological survey : The Wash
2Angle on the Broads : helping you get the most out of fishing on the Broads
3The importance of sediment release of phosphorus in the restoration of the Norfolk Broads
4Protecting the Lincolnshire Wash coast
5The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report
6Lake restoration : the role of biomanipulation : a one day seminar held in the Broads 18th March 1993 : organised by the National Rivers Authority and the Broads Authority
7Environmental monitoring of the Fal Estuary to support the Fal Swan study : final draft report
8Report on the results of a comparison of data from two surveys of the microfauna of the wash carried out in 1991 and 1993
9The development of biomanipulation techniques and control of phosphorus release from sediments (475/1/A) : LIFE project : restoration of the Norfolk Broads
10An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
11A desk study of the available information on wintering waterfowl feeding in the Wash, Lincolnshire and Norfolk
12The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall
13Flood alleviation proposals for Bakewell and Ashford in the Water
14An investigation into the bathing water quality at Porthallow
15Reduction in aldrin and dieldrin concentrations in the Newlyn River
16Water quality investigations in the Newlyn river catchment
17Wash zone report. Part 1 : the Wash NRA monitoring review
18Continuous water quality monitoring results for the Carnon river
19Pesticide residues in fish taken from the Newlyn River (1992)
20'Sea Vigil' water quality monitoring : the East coast 1992-1993
21'Sea Vigil' water quality monitoring : the East Anglian coast 1994
22Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
23Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998
24Aldrin and dieldrin concentrations in the Newlyn catchment during 1991 an interim report
25Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool