1 | An investigation into the bacteriological levels in the River Seaton |
2 | Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River |
3 | An investigation into the water quality of the River Waldon during wet weather |
4 | Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon |
5 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
6 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
7 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
8 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
9 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
10 | The Hartland Streams catchment management plan : action plan |
11 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
12 | Second annual review of the River Taw catchment management plan |
13 | Second annual review of the Taw / Torridge Estuary catchment management plan |
14 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
15 | Impact assessment of acidic and metalliferous pollution in the Fowley Stream |
16 | Second annual review of the River Torridge catchment management plan |
17 | Review of fishery regulations on the Rivers Taw and Torridge |
18 | First annual review of the River Taw catchment management plan (1996) |
19 | The Seaton, Looe and Fowey catchment management plan : action plan |
20 | Non-compliance with water quality objectives on the Croyde stream (upper catchment) |
21 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
22 | Investigation into the storm overflow discharge regime of Hill Barton Seawage Treatment Works Okehampton |
23 | Impact assessment of Meldon quarry on water quality in the West Okement river |
24 | An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream |
25 | Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001) |