Skip to main content
#Title
26East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
27Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
28Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001)
29Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
30An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95]
31An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley
32The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe
33Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997)
34An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96
35A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89
36An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
37A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake
38Investigations of discharges into the River Lemon at Newton Abbot
39Malodours and discolouration on the Wool Brook Sidmouth
40An investigation into the sewage system and storm overflow at Beer (1997)
41The Hartland Streams catchment management plan : action plan
42Second annual review of the River Taw catchment management plan
43Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish
44An assessment of water quality in the River Yarty catchment
45Second annual review of the Taw / Torridge Estuary catchment management plan
46First annual review of the Taw/Torridge estuary catchment management plan (1996)
47Report on the survey of SBM handlers in Devon
48Artificial recharge to groundwater in the Otter valley
49First annual review of the River Exe catchment management plan
50Environmental planning issues in the North Wessex area