26 | A collation of the environmental impact work carried out following the Rosebay oil spill, May 1990 |
27 | Investigation into the 1999 failure of the European Community bathing waters directive at Beer beach (2001) |
28 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
29 | Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent |
30 | Investigation into the 1999 failure of the European Community bathing waters directive at Teignmouth Town Beach (2001) |
31 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
32 | An investigation into the elevated BOD levels at Brocken Bridge (R30H001) on the Barnstaple Yeo [DEV/E/20/95] |
33 | An investigation into high concentrations of atrazine in surface waters and the increase in maize production in the Otter valley |
34 | The environmental impact of sewage discharges to the Salcombe Estuary, South Devon, from Anchor Watch, Cliff Raod, Salcombe |
35 | Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997) |
36 | An investigation into the bacterial water quality of the River Umber, N. Devon : December 1996 : DEV/WQ/14/96 |
37 | A biological investigation of the affects of discharges from Meldon quarry on the West Okemont River - 8/08/89 and 20/09/89 |
38 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
39 | A desk top study into the probable causes of poor water quality at Higher Hollacombe Farm (RO5K013) on the Hollacombe Lake |
40 | Investigations of discharges into the River Lemon at Newton Abbot |
41 | Malodours and discolouration on the Wool Brook Sidmouth |
42 | An investigation into the sewage system and storm overflow at Beer (1997) |
43 | The Hartland Streams catchment management plan : action plan |
44 | Second annual review of the Seaton, Looe and Fowey catchment management plan |
45 | Second annual review of the River Taw catchment management plan |
46 | Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish |
47 | An assessment of water quality in the River Yarty catchment |
48 | Second annual review of the Taw / Torridge Estuary catchment management plan |
49 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
50 | Report on the survey of SBM handlers in Devon |