1 | Study into the effect of Chertsey STW on the North Arm of the River Bourne |
2 | The effects of Guildford STW on the River Wey |
3 | The control of phosphorus in the catchment of the rivers Ant and Bure : interim report for period January - December 1992 |
4 | Biological assessment of the effects of Ivybridge Sewage Treatment Works on the River Erme |
5 | Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon |
6 | A review of the performance of Aldershot STW and its effect on the River Blackwater |
7 | Bacterial quality of the bathing waters at Seaton, Cornwall, and of the River Seaton |
8 | Study of the behaviour and impact of two sewage treatment works of the Thames catchment |
9 | Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent |
10 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
11 | An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge |
12 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
13 | An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95] |
14 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
15 | Investigation into the storm overflow discharge regime of Hill Barton Seawage Treatment Works Okehampton |
16 | Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool |
17 | Discharge monitoring in the Kennet catchment. Part 1 : ecological effects of sewage and trade effluents |
18 | Investigation into the frequency of storm overflow operation at Bradworthy sewage treatment works (1996) |
19 | Visits to Cley-next-to-the-sea and Salthouse sea defences, King's Lynn sewage treatment works |
20 | Devon area internal report - measurement of dissolved oxygen levels in the Dart estuary - March 1996 |
21 | An investigation to determine if Deep Moor Landfill Site is causing an impact downstream in the Peagham Stream |
22 | Investigation into failures of the River Dalch from Canns Mill Bridge to below Lapford sewage treatment works (2001) |
23 | Further monitoring of the impact of Crown Dale waste water treatment works final effluent on water quality |