Skip to main content
#Title
1The floods in Boscastle and North Cornwall 16 August 2004
2The Lowermoor environment report
3A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
4Beneath the town : safeguarding Bodmin from flooding
5Environmental monitoring of the Fal Estuary to support the Fal Swan study : final draft report
6The Natural (Baseline) Quality Of Groundwaters In England And Wales - The Culm Aquifers, SW England;
7Preliminary assessment of the ability of Restormel fish counter to enumerate the passage of migratory salmonids on the River Fowey : Cornwall Area Fisheries Science Team
8An investigation to determine the source of high levels of gamma-HCH in the Newlyn River during summer 1989
9Bass fishing in the Fal estuary and coastal area
10The identification and investigation of a dinoflagellate bloom in Mounts Bay, Cornwall
11Second annual review of the Seaton, Looe and Fowey catchment management plan
12Continuous water quality monitoring results for the Upper Tamar
13An investigation into the bathing water quality at Porthallow
14Reduction in aldrin and dieldrin concentrations in the Newlyn River
15Water quality investigations in the Newlyn river catchment
16An investigation of sewage on the beach at Porthcothan
17Identification of water quality problems in the Strat and Neet catchments
18Investigation of mercury contamination in the Red River catchment, West Cornwall
19The Seaton, Looe and Fowey catchment management plan : action plan
20Continuous water quality monitoring results for the Carnon river
21Pesticide residues in fish taken from the Newlyn River (1992)
22A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area
23Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998
24Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998
25Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989