Skip to main content
#Title
1Review of the findings of the prescribed flow at the Wallers Haven
2The River Darent conservation project
3River Darent : strategy for the enhancement of the River Darent, Kent
4The development of the Gammarus pulex feeding rate Bioassay
5An investigation into the flow interactions between the Spilsby Sandstone and the overlying aquifers of East Lincolnshire
6Investigations into the extent of saline water ingress into the River Parrett and the River Tone : February, March 1994
7The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report
8The River Lark project Final Report
9Fishery survey of the Doniford Stream 1994
10The River Lark project Model Manual
11Naturalisation of the Orton flow record
12The Investigation and Specification of Flow Measurement Structure Design Features that Aid the Migration of Fish
13Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS
14The behaviour of atrazine and simazine within the chalk aquifer : experimental results and interpretation
15The Possible effects on migratory fish in the River Dee of increased water abstraction
16The variation of hydraulic conductivity with depth in the object-orientated groundwater model ZOOMQ3D
17Catches of Migratory Fish in the River Don, Aberdeenshire- Consideration of the Availability of Fish
18East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
19River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
20Modelling the contribution from non-agricultural sources to nitrate pollution in the Sor Brook (Thames Region) (UC 3134)
21Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish
22A review of the optimum accuracy of flow and rainfall forecasting
23Estuarial migration of Atlantic salmon in the river Dee (North Wales)
24First annual review of the River Exe catchment management plan
25Setting up a hydraulic model of the Thurne Broads