Skip to main content
#Title
1The Pearsall Building
2The Opening Ceremony of The River Laboratory
3The Ferry Boat, Windermere
4Inflating the Lund Tubes
5The Lowermoor environment report
6The Evaluation of FDMM
7An aerial photograph of The Ferry House prior to the construction of The Pearsall Building
8The Natural (Baseline) Quality Of Groundwaters In England And Wales. The Chalk Of The South Downs
9Advertisement for the Letting of The Ferry Inn
10The Implications Of Climate Change For The Environment Agency
11The Natural (Baseline) Quality Of Groundwaters In England And Wales - The Chalk Of Berkshire And The Chilterns
12Aerial view of the River Laboratory
13Reed cutter used at the River Lab
14Determining The Causes Of 'Apparent Eutrophication' Effects
15The Recreational Use of Floodbanks Phase 1
16A Demonstration Of The Feasibility Of Soilpacs
17Evaluation of the effectiveness of the Water Fringe Option Scheme on Environmental Quality
18Further surveys to elucidate the distribution of the fine-lined pea mussel Pisidium tenuilineatum Stelfox, 1918
19The Natural (Baseline) Quality Of Groundwaters In England And Wales - The Culm Aquifers, SW England;
20Catches of Migratory Fish in the River Don, Aberdeenshire- Consideration of the Availability of Fish
21Implementation of the EC freshwater fish directive : water quality requirements for the support of fish life : report of the National Rivers Authority
22The Role of Bankside Habitat in River Ecology: The importance of riparian and marginal vegetation on the distribution and abundance of aquatice invertebrates
23An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 1998-March 1999
24The Economics of No-Spray Zones - a Study of the Risks and Benefits of Pesticide No-Spray Restrictions
25An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2001