1 | After the flood : 50 years of inland flood protection in East Anglia |
2 | The River Adur |
3 | The Ouse washes (folder) |
4 | The Ouse Washes Folder |
5 | The management of the water resources of the Lark groundwater unit |
6 | Planning for the rising tides - the Humber Estuary - consultation on managed realignment: information for the landowners and tenants - June 2002 |
7 | The Great Ouse (Bedford Ouse) fact file |
8 | The River Lark project Final Report |
9 | The Ely Ouse Essex water transfer scheme |
10 | Factors affecting the dispersal of coarse fish |
11 | The River Lark project Model Manual |
12 | The Nidd and Wharfe catchment (river factfiles) |
13 | Second interim report on the environmental impacts of the drought on Yorkshire's rivers April 1995 to April 1996 |
14 | The River Cam catchment management plan : annual monitoring report |
15 | Buckingham flood defence improvements : presentation of the preferred option |
16 | Valuing the Humber's environmental assets : proceedings of a seminar 15 November 2000 |
17 | The ecology and management of riverine trees : interim report |
18 | The Adur and Ouse catchment abstraction management strategy : consultation document |
19 | Survey of copper speciation in the Great Ouse estuary |
20 | The Swale, Ure and Ouse catchment (river factfiles) |
21 | Water resources for the future : a strategy for Southern region |
22 | Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
|
23 | Old Bedford incorporating the Middle Level and Ouse Washes : second annual review : July 2000 |
24 | River Wissey investigations : linking hydrology and ecology : summary of a recommendations for the River Wissey (OI/526) |
25 | Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey |