Skip to main content
#Title
1After the flood : 50 years of inland flood protection in East Anglia
2The River Adur
3The Ouse washes (folder)
4The Ouse Washes Folder
5The management of the water resources of the Lark groundwater unit
6Planning for the rising tides - the Humber Estuary - consultation on managed realignment: information for the landowners and tenants - June 2002
7The Great Ouse (Bedford Ouse) fact file
8The River Lark project Final Report
9The Ely Ouse Essex water transfer scheme
10Factors affecting the dispersal of coarse fish
11The River Lark project Model Manual
12The Nidd and Wharfe catchment (river factfiles)
13Second interim report on the environmental impacts of the drought on Yorkshire's rivers April 1995 to April 1996
14The River Cam catchment management plan : annual monitoring report
15Buckingham flood defence improvements : presentation of the preferred option
16Valuing the Humber's environmental assets : proceedings of a seminar 15 November 2000
17The ecology and management of riverine trees : interim report
18The Adur and Ouse catchment abstraction management strategy : consultation document
19Survey of copper speciation in the Great Ouse estuary
20The Swale, Ure and Ouse catchment (river factfiles)
21Water resources for the future : a strategy for Southern region
22Instream Flow Requirements of the River Wissey, Norfolk, Annex C - April 1993
23Old Bedford incorporating the Middle Level and Ouse Washes : second annual review : July 2000
24River Wissey investigations : linking hydrology and ecology : summary of a recommendations for the River Wissey (OI/526)
25Linking hydrology and ecology : River Wissey : Annex B aquatic macrophytes of the River Wissey