Skip to main content
#Title
1Review of the findings of the prescribed flow at the Wallers Haven
2The River Darent conservation project
3River Darent : strategy for the enhancement of the River Darent, Kent
4An investigation into the flow interactions between the Spilsby Sandstone and the overlying aquifers of East Lincolnshire
5Investigations into the extent of saline water ingress into the River Parrett and the River Tone : February, March 1994
6The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report
7The River Lark project Final Report
8Fishery survey of the Doniford Stream 1994
9The River Lark project Model Manual
10Naturalisation of the Orton flow record
11The Investigation and Specification of Flow Measurement Structure Design Features that Aid the Migration of Fish
12Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS
13The behaviour of atrazine and simazine within the chalk aquifer : experimental results and interpretation
14The Possible effects on migratory fish in the River Dee of increased water abstraction
15The variation of hydraulic conductivity with depth in the object-orientated groundwater model ZOOMQ3D
16Catches of Migratory Fish in the River Don, Aberdeenshire- Consideration of the Availability of Fish
17East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
18An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 1998-March 1999
19An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2001
20An investigation of ecological change in the rivers Kennet and Lambourn. Report for the period April 2000 - March 2001
21River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
22An investigation of ecological change in the rivers Kennet and Lambourn. Progress report for the period April 1999-March 2000
23Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish
24A review of the optimum accuracy of flow and rainfall forecasting
25Estuarial migration of Atlantic salmon in the river Dee (North Wales)