1 | Enhancing the River Otter |
2 | Preventing the spread of crayfish plague in the South West |
3 | Report on the management of the drainage regime within Exminster Marshes |
4 | Investigation into the probable cause of the 1999 failure of the EC bathing waters directive at Seaton (Devon) beach (70210103) (2000) |
5 | Assessment of the impact of discharges from Meldon Quarry on the water quality of the West Okement River |
6 | Biological investigation of the Common Lake Stream |
7 | An investigation into the water quality of the River Waldon during wet weather |
8 | Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon |
9 | Biological investigation into the impact of the storm overflow at Middle Marwood Sewage Treatment Works |
10 | Links : an overview of the work of the Environment Agency in Devon : autumn/winter 2003 |
11 | Investigation into the 1999 failure of the European Community bathing waters directive at Beer beach (2001) |
12 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
13 | Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD |
14 | Time of travel for the Greadon Farm pollution incident on the Upper Torridge of 19th August 1997 (1997) |
15 | Malodours and discolouration on the Wool Brook Sidmouth |
16 | An investigation into the sewage system and storm overflow at Beer (1997) |
17 | The Hartland Streams catchment management plan : action plan |
18 | An assessment of water quality in the River Yarty catchment |
19 | First annual review of the Taw/Torridge estuary catchment management plan (1996) |
20 | Report on the survey of SBM handlers in Devon |
21 | Impact of breakwaters on the water quality of Sidmouth beach |
22 | Review of fishery regulations on the Rivers Taw and Torridge |
23 | First annual review of the River Taw catchment management plan (1996) |
24 | Impact of reservoir construction construction on the Bruckland Stream |
25 | Investigation into the cause of high phenols in Budleigh Brook (1998) |