1 | Review of the findings of the prescribed flow at the Wallers Haven |
2 | The effects of flow reduction in the River Dee on the aquatic environment |
3 | The River Darent conservation project |
4 | A Report on the Drought on the River Darent |
5 | River Darent : strategy for the enhancement of the River Darent, Kent |
6 | Hysim model : modelling the flows of the River Deben |
7 | An investigation into the flow interactions between the Spilsby Sandstone and the overlying aquifers of East Lincolnshire |
8 | The release of ammonium and phosphorus from the sediments of the River Ant and Barton Broad : interim report |
9 | The River Lark project Final Report |
10 | The River Lark project Model Manual |
11 | Naturalisation of the Orton flow record |
12 | The Investigation and Specification of Flow Measurement Structure Design Features that Aid the Migration of Fish |
13 | The behaviour of atrazine and simazine within the chalk aquifer : experimental results and interpretation |
14 | The Possible effects on migratory fish in the River Dee of increased water abstraction |
15 | The variation of hydraulic conductivity with depth in the object-orientated groundwater model ZOOMQ3D |
16 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
17 | The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994 |
18 | River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team |
19 | Modelling the contribution from non-agricultural sources to nitrate pollution in the Sor Brook (Thames Region) (UC 3134) |
20 | Further Validation of PHABSIM for the Habitat Requirements of Salmonid Fish |
21 | A review of the optimum accuracy of flow and rainfall forecasting |
22 | Estuarial migration of Atlantic salmon in the river Dee (North Wales) |
23 | The drought of 1988-1992 in Anglia : a review |
24 | First annual review of the River Exe catchment management plan |
25 | Setting up a hydraulic model of the Thurne Broads |