1 | The restoration of the River Pang |
2 | The management of the water resources of the Lark groundwater unit |
3 | The Lambourn catchment modelling work |
4 | The River Darent conservation project |
5 | The water bill : trickle irrigation |
6 | A Report on the Drought on the River Darent |
7 | Investigation into the cause of high pH in the Budleigh Brook |
8 | The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society |
9 | Hydropower developments and the National Rivers Authority |
10 | Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies |
11 | Changes to the water abstraction licensing system |
12 | Naturalisation of the Orton flow record |
13 | Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS |
14 | Exploration of the reasonable needs for new licences brought about by the Water Act 2003 |
15 | Swords water quality study - phase 1 : modelling the water quality of the River Thames |
16 | Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR) |
17 | Review of the water abstraction charges scheme : consultation document : summary of responses to the consultation |
18 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin |
19 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000 |
20 | Water for the future in Kent : NRA response to the issues and options report |
21 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
22 | The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994 |
23 | River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team |
24 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London Basin. Progress report, March 1995 |
25 | Catchment abstraction management strategies (CAMS) and the Water Framework Directive (WFD) |