1 | The restoration of the River Pang |
2 | The management of the water resources of the Lark groundwater unit |
3 | The effects of flow reduction in the River Dee on the aquatic environment |
4 | The Lambourn catchment modelling work |
5 | The water bill : trickle irrigation |
6 | A Report on the Drought on the River Darent |
7 | A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024 |
8 | Hydropower developments and the National Rivers Authority |
9 | Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies |
10 | Changes to the water abstraction licensing system |
11 | Naturalisation of the Orton flow record |
12 | Exploration of the reasonable needs for new licences brought about by the Water Act 2003 |
13 | Swords water quality study - phase 1 : modelling the water quality of the River Thames |
14 | Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR) |
15 | Review of the water abstraction charges scheme : consultation document : summary of responses to the consultation |
16 | The Possible effects on migratory fish in the River Dee of increased water abstraction |
17 | East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe |
18 | The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994 |
19 | River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team |
20 | Rising groundwater levels in the chalk-basal sands aquifer of the Central London Basin. Progress report, March 1995 |
21 | Catchment abstraction management strategies (CAMS) and the Water Framework Directive (WFD) |
22 | The Adur and Ouse catchment abstraction management strategy : consultation document |
23 | The precious resource : a brief guide to managing our water resources |
24 | The Yarrow catchment : recommendations for statutory water quality objectives |
25 | Fisheries of the middle and lower Wylye and factors affecting their performance |