26 | A macroinvertebrate survey of the Releath stream and associated tributaries within the vicinity of Trevethan Farm : final draft report - Water Quality section, Cornwall area |
27 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/02- September 1998 |
28 | Assessment of the water quality before, during and post commissioning of the interim Falmouth sewage treatment scheme - Report No. TWQ/98/01- May 1998 |
29 | Investigation of the effects of sewage treatment works discharges on receiving waters in the Lowermoor Water Treatment Works supply area November 1989 |
30 | Aldrin and dieldrin concentrations in the Newlyn catchment during 1991 an interim report |
31 | Two year aesthetic survey of beaches in the South West (1990 and 1991) |
32 | Impact assessment of Helston Sewage Treatment Works on water quality of the River Cober Loe Pool |
33 | Investigation of tecnazene contamination in the Chyandour Brook west Cornwall during spring 1990 |
34 | Land use practices and pathways of pesticide residues in the Mount's Bay catchment, Cornwall |
35 | National marine baseline survey 1995 : littoral cell 7 : Lands End to the Severn Estuary |
36 | An assessment of mercury contamination in the Red River catchment : final draft report |
37 | A report into the impact of small dam construction at Delford bridge, De Lank river |
38 | Environmental protection draft report - united mines landfill appraisal of the disposal of waste from falmouth docks tip |
39 | An investigation into the presence of high levels of cadmium in sea-water samples from Mounts Bay, Cornwall |
40 | Gorran Haven (Little Perhaver) EC bathing waters directive failure 1996 : an investigation of the Gorran Haven Stream |
41 | Investigation to assess the compliance of Trelavour Kilns discharge CP7 (SW 9479 5722) with consent conditions and to identify any impact upon water quality in the St Dennis Stream : final draft report |