Skip to main content
#Title
1The restoration of the River Pang
2The management of the water resources of the Lark groundwater unit
3The effects of flow reduction in the River Dee on the aquatic environment
4The Lambourn catchment modelling work
5The River Darent conservation project
6Investigation into the cause of high pH in the Budleigh Brook
7The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society
8A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
9Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin
10Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000
11East Devon public water supply strategy as assessment of the hydrological impact of the Wimbleball pump storage scheme at key sites on the River Exe
12The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994
13River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
14Rising groundwater levels in the chalk-basal sands aquifer of the Central London Basin. Progress report, March 1995
15The Adur and Ouse catchment abstraction management strategy : consultation document
16The Yarrow catchment : recommendations for statutory water quality objectives
17Fisheries of the middle and lower Wylye and factors affecting their performance
18The Test catchment southern : recommendations for statutory water quality objectives
19Review of water resources in the Fylde Aquifer and Wyre catchment
20The Worcestershire Stour catchment : recommendations for statutory water quality objectives
21The Cam catchment : recommendations for statutory water quality objectives
22The Cam catchment, Anglian region : proposals for statutory water quality objectives
23First annual review of the River Taw catchment management plan (1996)
24The Dove catchment management plan : consultation report summary : January 1995
25Investigation into the cause of high phenols in Budleigh Brook (1998)