Skip to main content
#Title
1The restoration of the River Pang
2The management of the water resources of the Lark groundwater unit
3The effects of flow reduction in the River Dee on the aquatic environment
4The Lambourn catchment modelling work
5The River Darent conservation project
6The water bill : trickle irrigation
7A Report on the Drought on the River Darent
8The restoration of the River Ver : the success story of a collaborative project between the National Rivers Authority, Three Valleys Water and the Ver Valley Society
9A desk study to assess the compliance of the River Fowey with the EC Surface Water Abstraction Directive : June 1997 COR/97/024
10Hydropower developments and the National Rivers Authority
11Achieving the quality : annex : programme of environmental obligations agreed by the Secretary of State for the Environment, Transport and the Regions and for Wales for individual water companies
12Changes to the water abstraction licensing system
13Investigation of the Relationship between the LIFE Index and RIVPACS: Putting LIFE into RIVPACS
14Exploration of the reasonable needs for new licences brought about by the Water Act 2003
15Swords water quality study - phase 1 : modelling the water quality of the River Thames
16Methods for the prediction of the impact of groundwater abstraction on East Anglian wetlands (WD/95/SR)
17Review of the water abstraction charges scheme : consultation document : summary of responses to the consultation
18Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin
19The Possible effects on migratory fish in the River Dee of increased water abstraction
20Rising groundwater levels in the chalk-basal sands aquifer of the Central London basin : April 2000
21Water for the future in Kent : NRA response to the issues and options report
22The effects of water resources management on the rivers Bure, Wensum and Nar in North Norfolk : Final project report to the National Rivers Authority. July 1994
23River Darent low flow alleviation. Annex 3 : plan for the Darent : report of the joint NRA/TWUL project team
24Rising groundwater levels in the chalk-basal sands aquifer of the Central London Basin. Progress report, March 1995
25Catchment abstraction management strategies (CAMS) and the Water Framework Directive (WFD)