Skip to main content
#Title
1Study into the effect of Chertsey STW on the North Arm of the River Bourne
2Phosphorus in the Thames catchment
3The River Thames phosphate model
4The effects of Guildford STW on the River Wey
5An investigation into the bacteriological levels in the River Seaton
6An investigation into the effects of Woking STW on the River Wey
7An investigation into the effect of Farnham STW on the River Wey
8The control of phosphorus in the catchment of the rivers Ant and Bure : 3rd annual report May 1989
9The control of phosphorus in the catchment of the rivers Ant and Bure : interim report for period January - December 1992
10Contaminants entering the sea : data appendix : data on contaminant loads entering the seas around England and Wales for the years 1990-1993
11An investigation into the effects of Alton sewage works on the River Wey North
12Biological assessment of the effects of Ivybridge Sewage Treatment Works on the River Erme
13Investigation into the impact of Henstridge sewage treatment works on the River Umber, North Devon
14Biological investigation into the impact of the storm overflow at Middle Marwood Sewage Treatment Works
15A review of the performance of Aldershot STW and its effect on the River Blackwater
16Study of the behaviour and impact of two sewage treatment works of the Thames catchment
17Assessment of Ivybridge mobile monitoring station and investigation of the water quality of the River Erme and the effect of Ivybridge Sewage Treatment works final effluent
18Continuous water quality monitoring results collected from the river Torridge at Cockshilhay and Beam Bridge for the EU UWWTD
19An investigation to determine if Great Torrington STW is the cause of elevated copper and zinc concentrations in the River Torridge
20Malodours and discolouration on the Wool Brook Sidmouth
21Water quality in Anglian Region : the first five years
22A report on the River Chew at Chewton Mendip, 6th August 1992
23Targeted Monitoring Programme for Pharmaceuticals in the Aquatic Environment
24Monitoring of the Priory storm overflow on the River Tone at Taunton : June - November 1991 and water quality investigations unit January 1992
25An investigation to determine if South Molton STW is the cause of elevated copper and zinc concentrations downstream in the River Mole [DEV/E/18/95]