1 | Hampshire Avon DTC Diatom Monitoring Dataset 2011-2013 |
2 | Hampshire Avon DTC Macrophyte Monitoring Dataset 2011-2013 |
3 | Laboratory analysis of water samples, Winnacott Bridge at Caudworthy Ford, Tamar catchment |
4 | Laboratory analysis of water samples, Brixton Deverill, Hampshire Avon catchment |
5 | Laboratory analysis of water samples, Caudworthy Water at Caudworthy Ford, Tamar catchment |
6 | Laboratory analysis of water samples at Ebble downstream site, Hampshire Avon catchment |
7 | Laboratory analysis of water samples, Sem at Cool's Cottage, Hampshire Avon catchment |
8 | Laboratory analysis of water samples, Ebble upstream, Hampshire Avon catchment |
9 | Laboratory analysis of water samples, Sem at Priors Farm, Hampshire Avon catchment |
10 | Laboratory analysis of water samples, Burracott, Neet catchment |
11 | Hampshire Avon DTC Ecological Monitoring |
12 | Hampshire Avon DTC Macroinvertebrate Monitoring Dataset 2010-2013 |
13 | Hampshire Avon DTC Deposited Fine-grained Sediment Monitoring Dataset 2010-2013 |
14 | Laboratory analysis of water samples, Wylye at Kingston Deverill, Hampshire Avon catchment |
15 | A Report on the Drought on the River Darent |
16 | Monitored water temperature, dissolved oxygen concentration, pH values and river turbidity, Wylye at Brixton Deverill, H. Avon |
17 | Water resources for the future : a summary of the strategy for Southern region |
18 | Water resources for the future : a summary of the strategy for Anglian Region |
19 | Operating Manual For Transportable Estuarine Ph Instrument |
20 | Technical Summary - Quantifying Point Source Inputs of Pesticides to River Catchments |
21 | Water Level Management Plans - Scoping Study |
22 | Water resources development strategy : final report |
23 | R and D Strategy to Support Implementation of the Water Framework Directive - Preliminary Scoping Report |
24 | Management Strategies and Mitigation Measures Required to Deliver WFD for Impoundments: Volume 1 Preliminary Guidance Document |
25 | The Delineation and Characterisation of Groundwater Bodies to Meet the Requirements of the EU Water Framework Directive |