Skip to main content

PDF


Title: Eurwg catchment management plan : phase 2 : resolution of catchment problems
Document Type: Monograph
Abstract:
This Phase 2 Report of the Eurwg Catchment Management Plan deals specifically with the resolution of those problems which were Identified in the Phase 1 Report. The report represents the Plan of Action for the catchment, and the problems are dealt with in a standardised way which relects this philosophy: The nature of the problem is defined; The cause of the problem is described; The solution to the problem, which has been formulated after consultation between the NRA and relevant outside organisations, Is presented; Responsibility for carrying out the remedial work is assigned; The timetable is given for the work to be carried out; The financial implications of carrying out the remedial measures are presented, in terms of the one-off costs required to make an improvement and the ongoing annual costs required to maintain that improvement.
Publisher: National Rivers Authority
Publication Date: [before 1996]
Publication Place: Cardiff
Subject Keywords: RiversCatchment Management PlansAction plans
Geographic Keywords: WalesOgmore to Tawe catchment
Extent: n.p. [25]
Permalink: http://www.environmentdata.org/archive/ealit:3355
Total file downloads: 292

Download PDF    Display PDF in separate tab