Skip to main content

PDF


Title: River maintenance evaluation
Author: J. Morris
Author: J.A.L. Dunderdale
Document Type: Monograph
Annotation: EA additional title info: R&D 317/4/ST
Abstract:
The first Interim Report, (R and D 306/3/ST September 1992) provided the background to this River Maintenance Evaluation Project. The project commenced in March 1992 with Stage I, the baseline survey. The objective of the baseline survey was to collect information on channel hydraulics, land use, conditions of flooding and waterlogging and points of environmental interest prior to the river maintenance work. Stage II of the study began in October 1992 with the second set of site visits. This stage involves the ongoing monitoring and evaluation of sites post-maintenance over three farming years. The aims, objectives and methodology of Stage II are summarised in this report.
Publisher: National Rivers Authority
Publication Date: 1992
Publication Place: Bedford
Subject Keywords: Hydraulic engineeringLand use planningClimateEnvironmental factorsRiver rehabilitationFlooding
Geographic Keywords: Sence (Leicestershire)Soar catchmentTame Anker and Mease catchmentWampoolWaver Wampool catchmentLune catchmentYartyEast Devon catchmentArrow (Wales)Wales
Extent: 25
Permalink: http://www.environmentdata.org/archive/ealit:2310
Total file downloads: 343

Download PDF    Display PDF in separate tab