Skip to main content

PDF


Title: Welland and Nene Local Flood Defence Committee annual report 1996/97
Author: Environment Agency Anglian Region
Document Type: Monograph
Abstract:
This report summarises the flood defence works undertaken during 1996/97 within the Welland and Nene Catchment and outlines the associated financial position. The Capital Works Programme again had dual emphasis between Tidal and Fluvial works. Tidal protection works have been carried out to the River Nene and the major refurbishment of the River Welland tidal sluice at Marsh Road, Spalding has been largely completed. Alongside these schemes, further stabilisation works to the River Glen have been carried out and the refurbishment of Bourne Eau Pumping Station was completed early in the year.
Publisher: Environment Agency
Publication Date: 1997
Publication Place: Peterborough
Subject Keywords: Flood defence committeesAction plansAnnual reports
Geographic Keywords: EA AnglianWelland catchmentNene catchment
Extent: 26
Permalink: http://www.environmentdata.org/archive/ealit:1540
Total file downloads: 240

Download PDF    Display PDF in separate tab