Title: Summary report on integrated large scale audit of Rugby Group plc Southam Works, 15-17 October 1996
Author: Environment Agency Midlands Region
Document Type: Monograph
Abstract:
This report describes an audit of Rugby Cement, Southam Works which took place between 15 and 17 October 1996. This process is authorised under Part I of the Environmental Protection Act 1990 and, as such, is subject to Integrated Pollution Control (IPC). The site also has a Waste Management Licence for operation of the landfill of process wastes. The major potential environmental hazards are from dust, nitrogen oxide and sulphur dioxide. The primary objective of the audit was to assess compliance with.the IPC authorisation and to examine those underlying factors affecting compliance. In addition to detailed examination of the manufacturing process, consideration was given to factors which have an impact upon environmental performance, such as manning levels, training, supervision and maintenance programmes. This document is a summary of the main report and presents the main findings of the audit, incorporating a number of recommendations. The main report contains the Company's response to these recommendations. The process has been considered in terms of a series of steps from raw materials handling to packing and dispatch of the finished product.
Publisher: Environment Agency
Publication Date: 1996
Publication Place: Solihull
Subject Keywords: Integrated control; Industrial pollution; Industrial wastes; Waste management
Geographic Keywords: EA Midlands; Warwickshire Avon catchment
Extent: 7
Permalink: http://www.environmentdata.org/archive/ealit:1457
Total file downloads: 318
Download PDF Display PDF in separate tab